United States › Grid › Interconnection queues › Indiana
BATTERY STORAGE · MISOBattery storage project J1189, Brown County
Battery storage project J1189, Brown County is a 5.0 MW battery storage request under construction in the MISO interconnection queue, in Brown County, Indiana, connecting to DUKE ENERGY INDIANA.
Queue statusUnder construction
- PlanningQueued Mar 2018 (completed)
- Consented (completed)
- Construction (current stage)
- OperatingMar 2022 (not yet reached)
- Closed (not yet reached)
Request details
- Queue ID
- J1189
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- DUKE ENERGY INDIANA
- Connection point (POI)
- Crane Solar 69kV Substation
- Location
- Brown County, Indiana
- Technology
- Battery: 5.0 MW
- Total requested
- 5.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA; Post GIA Status: Under Construction
- Queue status
- Active
- Entered queue
- 12 March 2018
- Proposed online date
- January 2019
- Came online
- March 2022
Location
Marker shows the centre of Brown County; the queue data does not give exact sites.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem