United States βΊ Grid βΊ Interconnection queues βΊ Pennsylvania
HYDRO Β· PJMHydro project U1-078, Forest County
Hydro project U1-078, Forest County is a 8.0 MW hydro request withdrawn in the PJM interconnection queue, in Forest County, Pennsylvania, connecting to PENELEC.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2008 (completed)
- Withdrawn / abandonedNov 2008 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- U1-078
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PENELEC
- Connection point (POI)
- Tionesta Dam
- Location
- Forest County, Pennsylvania
- Technology
- Hydro: 8.0 MW
- Total requested
- 8.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 14 April 2008
- Proposed online date
- January 2015
- Withdrawn
- November 2008
Location
Marker shows the centre of Forest County; the queue data does not give exact sites.
Power plants in Pennsylvania Β· Transmission lines in Pennsylvania
Other requests in Forest County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem