United States βΊ Grid βΊ Interconnection queues βΊ Indiana
SOLAR Β· MISOSolar project J3707, Putnam County
Solar project J3707, Putnam County is a 40.0 MW solar request withdrawn in the MISO interconnection queue, in Putnam County, Indiana, connecting to DUKE ENERGY INDIANA.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2024 (completed)
- Withdrawn / abandonedJul 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J3707
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- DUKE ENERGY INDIANA
- Connection point (POI)
- Other_
- Location
- Putnam County, Indiana
- Technology
- Solar: 40.0 MW
- Total requested
- 40.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 1
- Queue status
- Withdrawn
- Entered queue
- 16 April 2024
- Proposed online date
- September 2027
- Withdrawn
- July 2025
Location
Marker shows the centre of Putnam County; the queue data does not give exact sites.
Other requests in Putnam County
- Solar project J3145, Putnam CountySolar Β· 150 MW Β· in study
- Solar project J3144, Putnam CountySolar Β· 150 MW Β· in study
- Other project G075, Putnam CountyOther Β· 500 MW Β· withdrawn
- Gas project G304, Putnam CountyGas Β· 250 MW Β· withdrawn
- Solar project J3146, Putnam CountySolar Β· 200 MW Β· withdrawn
- Solar project J1563, Putnam CountySolar Β· 200 MW Β· withdrawn
- Solar project J1548, Putnam CountySolar Β· 200 MW Β· withdrawn
- Battery storage project J3813, Putnam CountyBattery storage Β· 100 MW Β· withdrawn
- Battery storage project J3804, Putnam CountyBattery storage Β· 100 MW Β· withdrawn
- Solar project J3143, Putnam CountySolar Β· 50.0 MW Β· withdrawn
- Solar project J3740, Putnam CountySolar Β· 40.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem