United States βΊ Grid βΊ Interconnection queues βΊ Nebraska
SOLAR Β· SPPSolar project GEN-2017-008, Nuckolls County
Solar project GEN-2017-008, Nuckolls County is a 305 MW solar request withdrawn in the SPP interconnection queue, in Nuckolls County, Nebraska, connecting to NPPD.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2017 (completed)
- Withdrawn / abandonedJun 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2017-008
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- NPPD
- Connection point (POI)
- Pauline 345kV Substation
- Location
- Nuckolls County, Nebraska
- Technology
- Solar: 305 MW
- Total requested
- 305 MW
- Service type
- Energy only (ERIS)
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 14 April 2017
- Proposed online date
- December 2019
- Withdrawn
- June 2021
Location
Marker shows the centre of Nuckolls County; the queue data does not give exact sites.
Other requests in Nuckolls County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem