SOLAR Β· SPPSolar project GEN-2016-008, Greer County
Solar project GEN-2016-008, Greer County is a 40.0 MW solar request withdrawn in the SPP interconnection queue, in Greer County, Oklahoma, connecting to WFEC.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2016 (completed)
- Withdrawn / abandonedFeb 2017 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2016-008
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- WFEC
- Connection point (POI)
- Granite 69 kV Sub
- Location
- Greer County, Oklahoma
- Technology
- Solar: 40.0 MW
- Total requested
- 40.0 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 24 March 2016
- Proposed online date
- June 2019
- Withdrawn
- February 2017
Location
Marker shows the centre of Greer County; the queue data does not give exact sites.