United States β€Ί Grid β€Ί Interconnection queues β€Ί Louisiana

BATTERY STORAGE Β· MISO

Battery storage project J4108, Webster Parish County

Battery storage project J4108, Webster Parish County is a 150 MW battery storage request withdrawn in the MISO interconnection queue, in Webster Parish County, Louisiana, connecting to ENTERGY LOUISIANA.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2025 (completed)
  2. Withdrawn / abandonedDec 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J4108
Grid region
MISO (Midcontinent)
Utility / transmission owner
ENTERGY LOUISIANA
Connection point (POI)
SAREPTA
Location
Webster Parish County, Louisiana
Technology
Battery: 150 MW
Total requested
150 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
7 October 2025
Proposed online date
September 2030
Withdrawn
December 2025

Location

Marker shows the centre of Webster Parish County; the queue data does not give exact sites.

Power plants in Louisiana Β· Transmission lines in Louisiana

Other requests in Webster Parish County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem