United States › Grid › Interconnection queues › Illinois

BATTERY STORAGE · PJM

West Chicago Energy Storage

West Chicago Energy Storage is a 20.0 MW battery storage request built and operating in the PJM interconnection queue, in Dupage County, Illinois, connecting to ComEd.

Queue statusOperating
  1. PlanningQueued Oct 2013 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingSep 2015 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
Z1-106
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
ComEd
Connection point (POI)
West Chicago 34kV
Location
Dupage County, Illinois
Technology
Battery: 20.0 MW
Total requested
20.0 MW
Service type
Energy only (ERIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Wholesale Market P
Queue status
Operational
Entered queue
31 October 2013
Proposed online date
December 2015
Came online
September 2015

Location

Marker shows the centre of Dupage County; the queue data does not give exact sites.

Power plants in Illinois · Transmission lines in Illinois

Other requests in Dupage County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem