United States βΊ Grid βΊ Interconnection queues βΊ Arkansas
BATTERY STORAGE Β· MISOBattery storage project J3023, Hot Spring County
Battery storage project J3023, Hot Spring County is a 400 MW battery storage request withdrawn in the MISO interconnection queue, in Hot Spring County, Arkansas, connecting to ENTERGY ARKANSAS.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedMar 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J3023
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY ARKANSAS
- Connection point (POI)
- H.S. EHV 500 kV Substation
- Location
- Hot Spring County, Arkansas
- Technology
- Battery: 400 MW
- Total requested
- 400 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 14 September 2022
- Proposed online date
- April 2026
- Withdrawn
- March 2023
Location
Marker shows the centre of Hot Spring County; the queue data does not give exact sites.
Other requests in Hot Spring County
- Gas project J3829, Hot Spring CountyGas Β· 770 MW Β· in study
- Solar project J3081, Hot Spring CountySolar Β· 105 MW Β· in study
- Gas project J4111, Hot Spring CountyGas Β· 650 MW Β· withdrawn
- Solar + storage project J2717, Hot Spring CountySolar + storage Β· 600 MW Β· withdrawn
- Solar project J2623, Hot Spring CountySolar Β· 125 MW Β· withdrawn
- Solar project J3193, Hot Spring CountySolar Β· 100 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem