ONSHORE WIND Β· ISO-NEWind Project-Phase 4( MPS Queue # 8)
Wind Project-Phase 4( MPS Queue # 8) is a 250 MW onshore wind request withdrawn in the ISO-NE interconnection queue, connecting to MPS.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2008 (completed)
- Withdrawn / abandonedSep 2013 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 257
- Grid region
- ISO-NE (New England)
- Utility / transmission owner
- MPS
- Connection point (POI)
- Maine Public Service System, upgrades include tap
- Location
- Maine
- Technology
- Wind: 250 MW
- Total requested
- 250 MW
- Queue status
- Withdrawn
- Entered queue
- 14 April 2008
- Proposed online date
- September 2013
- Withdrawn
- September 2013
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem