United States β€Ί Grid β€Ί Interconnection queues β€Ί Pennsylvania

GAS Β· PJM

Gas project H14_W67

Gas project H14_W67 is a 500 MW gas request withdrawn in the PJM interconnection queue, connecting to APS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2001 (completed)
  2. Withdrawn / abandonedJul 2002 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
H14_W67
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
APS
Connection point (POI)
Enon 138 kV
Location
Pennsylvania
Technology
Gas: 500 MW
Total requested
500 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study
Queue status
Withdrawn
Entered queue
10 December 2001
Proposed online date
January 2007
Withdrawn
July 2002

Location

No county location in the queue data.

Power plants in Pennsylvania Β· Transmission lines in Pennsylvania

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem