United States βΊ Grid βΊ Interconnection queues βΊ New Jersey
GAS Β· PJMGas project D26, Mercer County
Gas project D26, Mercer County is a 550 MW gas request withdrawn in the PJM interconnection queue, in Mercer County, New Jersey, connecting to PSEG.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2000 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- D26
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PSEG
- Connection point (POI)
- Mercer 230kV
- Location
- Mercer County, New Jersey
- Technology
- Gas: 550 MW
- Total requested
- 550 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 31 July 2000
Location
Marker shows the centre of Mercer County; the queue data does not give exact sites.
Power plants in New Jersey Β· Transmission lines in New Jersey
Other requests in Mercer County
- Lamberton Road BatteryBattery storage Β· 170 MW Β· agreement signed
- Property #6Solar Β· 8.0 MW Β· built
- Princeton University Generating FacilityOther Β· 5.0 MW Β· built
- Princeton Hospital NRG Energy CenterGas Β· 2.0 MW Β· built
- Hopewell Valley SolarSolar + storage Β· 1.0 MW Β· built
- Rider UniversitySolar Β· 0.7 MW Β· built
- Pennington 13 kV SolarSolar + storage Β· 0.6 MW Β· built
- Battery storage project AF2-071, Mercer CountyBattery storage Β· 100 MW Β· withdrawn
- Solar + storage project AF1-109, Mercer CountySolar + storage Β· 20.0 MW Β· withdrawn
- East Windsor Solar FarmSolar Β· 13.0 MW Β· withdrawn
- Solar project X2-070, Mercer CountySolar Β· 10.0 MW Β· withdrawn
- BKB PropertiesSolar Β· 10.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem