United States βΊ Grid βΊ Interconnection queues βΊ North Dakota
ONSHORE WIND Β· MISOOnshore wind project J251, Ramsey County
Onshore wind project J251, Ramsey County is a 27.5 MW onshore wind request withdrawn in the MISO interconnection queue, in Ramsey County, North Dakota.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2012 (completed)
- Withdrawn / abandonedNov 2015 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J251
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- OTP 41.6 kV Oberon Substation
- Location
- Ramsey County, North Dakota
- Technology
- Wind: 27.5 MW
- Total requested
- 27.5 MW
- Study phase
- SPA - SIS
- Queue status
- Withdrawn
- Entered queue
- 10 September 2012
- Withdrawn
- November 2015
Location
Marker shows the centre of Ramsey County; the queue data does not give exact sites.
Power plants in North Dakota Β· Transmission lines in North Dakota
Other requests in Ramsey County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem