United States βΊ Grid βΊ Interconnection queues βΊ Illinois
OTHER Β· MISOOther project J2697, St. Clair County
Other project J2697, St. Clair County is a 500 MW other request withdrawn in the MISO interconnection queue, in St. Clair County, Illinois, connecting to AMEREN ILLINOIS.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedOct 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2697
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- AMEREN ILLINOIS
- Connection point (POI)
- 7ASTER - 7CMDR 345.0kV
- Location
- St. Clair County, Illinois
- Technology
- Solar: 500 MW Β· Wind Β· Battery
- Total requested
- 500 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 15 September 2022
- Proposed online date
- April 2027
- Withdrawn
- October 2025
Location
Marker shows the centre of St. Clair County; the queue data does not give exact sites.
Other requests in St. Clair County
- Solar project J1311, St. Clair CountySolar Β· 150 MW Β· agreement signed
- Battery storage project J2998, St. Clair CountyBattery storage Β· 200 MW Β· in study
- SurplusBattery storage Β· 150 MW Β· in study
- Solar + storage project J3184, St. Clair CountySolar + storage Β· 145 MW Β· in study
- Battery storage project J3200, St. Clair CountyBattery storage Β· 250 MW Β· withdrawn
- Battery storage project J2204, St. Clair CountyBattery storage Β· 200 MW Β· withdrawn
- Solar project J2645, St. Clair CountySolar Β· 199 MW Β· withdrawn
- Battery storage project J3297, St. Clair CountyBattery storage Β· 150 MW Β· withdrawn
- Battery storage project J3011, St. Clair CountyBattery storage Β· 100 MW Β· withdrawn
- Solar project J3069, St. Clair CountySolar Β· 70.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem