United States βΊ Grid βΊ Interconnection queues βΊ North Carolina
SOLAR Β· SOUTHEASTSolar project 569290, Jones County
Solar project 569290, Jones County is a 172 MW solar request withdrawn in the Southeast interconnection queue, in Jones County, North Carolina, connecting to Duke Energy Progress.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2022 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 569290
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Progress
- Developer
- Duke Energy Progress, LLC
- Connection point (POI)
- JACKSONVILLE - NEW BERN 230KV
- Location
- Jones County, North Carolina
- Technology
- Solar: 172 MW
- Total requested
- 172 MW
- Service type
- Network resource (NRIS)
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 28 June 2022
Location
Marker shows the centre of Jones County; the queue data does not give exact sites.
Power plants in North Carolina Β· Transmission lines in North Carolina
Other requests in Jones County
- Other project PP00043, Jones CountyOther Β· 80.0 MW Β· in study
- Solar project 962748, Jones CountySolar Β· 80.0 MW Β· in study
- Solar project 569086, Jones CountySolar Β· 80.0 MW Β· withdrawn
- Solar project 962986, Jones CountySolar Β· 80.0 MW Β· withdrawn
- Solar project 917353, Jones CountySolar Β· 80.0 MW Β· withdrawn
- Solar project 917429, Jones CountySolar Β· 80.0 MW Β· withdrawn
- Solar project 21933, Jones CountySolar Β· 80.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem