SOLAR Β· SPPSolar project GEN-2022-237, Pottawatomie County
Solar project GEN-2022-237, Pottawatomie County is a 150 MW solar request withdrawn in the SPP interconnection queue, in Pottawatomie County, Oklahoma, connecting to OGE.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2023 (completed)
- Withdrawn / abandonedMar 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2022-237
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- OGE
- Connection point (POI)
- Maud 138 kV substation
- Location
- Pottawatomie County, Oklahoma
- Technology
- Solar: 150 MW
- Total requested
- 150 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 28 February 2023
- Proposed online date
- September 2028
- Withdrawn
- March 2025
Location
Marker shows the centre of Pottawatomie County; the queue data does not give exact sites.