United States βΊ Grid βΊ Interconnection queues βΊ New Jersey
SOLAR Β· PJMSolar project AE2-165, Passaic County
Solar project AE2-165, Passaic County is a 2.6 MW solar request withdrawn in the PJM interconnection queue, in Passaic County, New Jersey, connecting to PSEG.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2019 (completed)
- Withdrawn / abandonedAug 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AE2-165
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PSEG
- Connection point (POI)
- Cedar Grove 13.2 kV
- Location
- Passaic County, New Jersey
- Technology
- Solar: 2.6 MW
- Total requested
- 2.6 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 15 March 2019
- Proposed online date
- March 2020
- Withdrawn
- August 2019
Location
Marker shows the centre of Passaic County; the queue data does not give exact sites.
Power plants in New Jersey Β· Transmission lines in New Jersey
Other requests in Passaic County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem