United States βΊ Grid βΊ Interconnection queues βΊ Alabama
GAS Β· SOUTHEASTGas project IC-211, Autauga County
Gas project IC-211, Autauga County is a 630 MW gas request withdrawn in the Southeast interconnection queue, in Autauga County, Alabama, connecting to Southern Company.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2003 (completed)
- Withdrawn / abandonedJun 2004 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- IC-211
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Southern Company
- Connection point (POI)
- Autaugaville Substation 500 kV Bus
- Location
- Autauga County, Alabama
- Technology
- Gas: 630 MW
- Total requested
- 630 MW
- Service type
- Network resource (NRIS)
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 11 September 2003
- Withdrawn
- June 2004
Location
Marker shows the centre of Autauga County; the queue data does not give exact sites.
Other requests in Autauga County
- Gas project 25-IC-1317, Autauga CountyGas Β· 229 MW Β· in study
- Gas project 25-IC-1318, Autauga CountyGas Β· 111 MW Β· in study
- Gas project 25-IC-1319, Autauga CountyGas Β· 111 MW Β· in study
- Gas project IC-1012, Autauga CountyGas Β· 27.0 MW Β· in study
- Central Alabama Generating StationGas Β· 951 MW Β· built
- Lindsay Hill (Tenaska Bill 1)Gas Β· 890 MW Β· built
- Central Alabama Generating Facility (Tenaska Bil2)Gas Β· 890 MW Β· built
- Harris 2 (Autauga 2)Gas Β· 630 MW Β· built
- Harris 1 (Autauga 1)Gas Β· 630 MW Β· built
- Gas project IC-212, Autauga CountyGas Β· 920 MW Β· withdrawn
- Gas project IC-213, Autauga CountyGas Β· 920 MW Β· withdrawn
- Gas project IC-036, Autauga CountyGas Β· 660 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem