GAS Β· SOUTHEASTGas project IC-089, Covington County
Gas project IC-089, Covington County is a 640 MW gas request withdrawn in the Southeast interconnection queue, in Covington County, Alabama, connecting to Southern Company.
Queue statusWithdrawn / abandoned
- Planning (completed)
- Withdrawn / abandonedNov 2001 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- IC-089
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Southern Company
- Connection point (POI)
- OPP 230 kV Substation
- Location
- Covington County, Alabama
- Technology
- Gas: 640 MW
- Total requested
- 640 MW
- Service type
- Energy only (ERIS)
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Withdrawn
- November 2001
Location
Marker shows the centre of Covington County; the queue data does not give exact sites.
Other requests in Covington County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem