United States βΊ Grid βΊ Interconnection queues βΊ Missouri
SOLAR Β· SPPSolar project GEN-2019-035, Barry County
Solar project GEN-2019-035, Barry County is a 80.0 MW solar request withdrawn in the SPP interconnection queue, in Barry County, Missouri, connecting to EDE.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2019 (completed)
- Withdrawn / abandonedFeb 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- OperatingDec 2025 (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2019-035
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- EDE
- Connection point (POI)
- Reeds Spring-Aurora 161kV Line
- Location
- Barry County, Missouri
- Technology
- Solar: 80.0 MW
- Total requested
- 80.0 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 2 May 2019
- Proposed online date
- December 2025
- Came online
- December 2025
- Withdrawn
- February 2025
Location
Marker shows the centre of Barry County; the queue data does not give exact sites.
Other requests in Barry County