United States β€Ί Grid β€Ί Interconnection queues β€Ί Missouri

BATTERY STORAGE Β· SPP

Battery storage project GEN-2023-234, Barry County

Battery storage project GEN-2023-234, Barry County is a 74.9 MW battery storage request withdrawn in the SPP interconnection queue, in Barry County, Missouri, connecting to EDE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2023 (completed)
  2. Withdrawn / abandonedNov 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. OperatingNov 2025 (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2023-234
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
EDE
Connection point (POI)
Monett 161 kV Substation
Location
Barry County, Missouri
Technology
Battery: 74.9 MW
Total requested
74.9 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
2 October 2023
Proposed online date
November 2025
Came online
November 2025
Withdrawn
November 2023

Location

Marker shows the centre of Barry County; the queue data does not give exact sites.

Power plants in Missouri Β· Transmission lines in Missouri

Other requests in Barry County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem