United States βΊ Grid βΊ Interconnection queues βΊ Iowa
SOLAR Β· MISOSolar project J2445, Greene County
Solar project J2445, Greene County is a 50.0 MW solar request withdrawn in the MISO interconnection queue, in Greene County, Iowa, connecting to ITC MIDWEST.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedMar 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J2445
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ITC MIDWEST
- Connection point (POI)
- Karma 161kV
- Location
- Greene County, Iowa
- Technology
- Solar: 50.0 MW
- Total requested
- 50.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 15 September 2022
- Proposed online date
- September 2025
- Withdrawn
- March 2023
Location
Marker shows the centre of Greene County; the queue data does not give exact sites.
Other requests in Greene County
- Solar project J1313, Greene CountySolar Β· 100 MW Β· agreement signed
- Onshore wind project H096, Greene CountyOnshore wind Β· 50.0 MW Β· built
- Onshore wind project G530, Greene CountyOnshore wind Β· 14.0 MW Β· built
- Onshore wind project R62, Greene CountyOnshore wind Β· 300 MW Β· withdrawn
- Onshore wind project R61, Greene CountyOnshore wind Β· 200 MW Β· withdrawn
- Solar project J3148, Greene CountySolar Β· 131 MW Β· withdrawn
- Onshore wind project J093, Greene CountyOnshore wind Β· 50.0 MW Β· withdrawn
- Onshore wind project J118, Greene CountyOnshore wind Β· 50.0 MW Β· withdrawn
- Onshore wind project J092, Greene CountyOnshore wind Β· 20.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem