SOLAR · PJMWhite Township Solar Farm
White Township Solar Farm is a 8.0 MW solar request withdrawn in the PJM interconnection queue, in Warren County, New Jersey, connecting to JCPL.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2011 (completed)
- Withdrawn / abandonedMar 2015 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- W4-068
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- JCPL
- Connection point (POI)
- Hazen-Pequest River 34.5kV
- Location
- Warren County, New Jersey
- Technology
- Solar: 8.0 MW
- Total requested
- 8.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Wholesale Market P
- Queue status
- Withdrawn
- Entered queue
- 31 January 2011
- Proposed online date
- December 2014
- Withdrawn
- March 2015
Location
Marker shows the centre of Warren County; the queue data does not give exact sites.
Power plants in New Jersey · Transmission lines in New Jersey
Other requests in Warren County
- Harmony Plains Solar and Storage FacilitySolar + storage · 70.0 MW · agreement signed
- Mansfield #3Battery storage · 20.0 MW · agreement signed
- Warren Glen StorageBattery storage · 20.0 MW · agreement signed
- Washington Solar PH IISolar · 11.0 MW · agreement signed
- Solar project AI1-137, Warren CountySolar · 155 MW · in study
- Solar project AI1-120, Warren CountySolar · 51.6 MW · in study
- Solar project AI1-118, Warren CountySolar · 37.6 MW · in study
- Solar project AI2-437, Warren CountySolar · 20.0 MW · in study
- Solar project AG2-625, Warren CountySolar · 19.6 MW · in study
- Kober Solar FarmSolar · 19.3 MW · in study
- Solar project AG2-626, Warren CountySolar · 12.5 MW · in study
- Alpha Battery Storage FacilityBattery storage · 20.0 MW · built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem