United States βΊ Grid βΊ Interconnection queues βΊ Utah
BATTERY STORAGE Β· WESTBattery storage project C2-66, Weber County
Battery storage project C2-66, Weber County is a 150 MW battery storage request withdrawn in the West interconnection queue, in Weber County, Utah, connecting to PacifiCorp.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2022 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- C2-66
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- PacifiCorp
- Connection point (POI)
- West Ogden substation
- Location
- Weber County, Utah
- Technology
- Battery: 150 MW
- Total requested
- 150 MW
- Service type
- NRIS and ERIS
- Queue status
- Withdrawn
- Entered queue
- 10 May 2022
- Proposed online date
- June 2024
Location
Marker shows the centre of Weber County; the queue data does not give exact sites.
Other requests in Weber County
- Battery storage project C3-171, Weber CountyBattery storage Β· 200 MW Β· in study
- Battery storage project 725, Weber CountyBattery storage Β· 0.3 MW Β· built
- Gas project 307, Weber CountyGas Β· 400 MW Β· withdrawn
- Gas project 264, Weber CountyGas Β· 380 MW Β· withdrawn
- Gas project 244, Weber CountyGas Β· 380 MW Β· withdrawn
- Battery storage project C3-170, Weber CountyBattery storage Β· 200 MW Β· withdrawn
- Gas project 424, Weber CountyGas Β· 175 MW Β· withdrawn
- Solar project 1000, Weber CountySolar Β· 120 MW Β· withdrawn
- Solar project 993, Weber CountySolar Β· 74.9 MW Β· withdrawn
- Solar project 941, Weber CountySolar Β· 45.0 MW Β· withdrawn
- Solar project 293-A, Weber CountySolar Β· 30.0 MW Β· withdrawn
- Solar project 317, Weber CountySolar Β· 19.9 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem