United States › Grid › Interconnection queues › New York
BATTERY STORAGE · NYISONYC Energy BNY Phase 1
NYC Energy BNY Phase 1 is a 79.9 MW battery storage request withdrawn in the NYISO interconnection queue, in Kings County, New York, connecting to ConEd.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2020 (completed)
- Withdrawn / abandonedDec 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1006
- Grid region
- NYISO (New York)
- Utility / transmission owner
- ConEd
- Developer
- NYC Energy
- Connection point (POI)
- Hudson Ave Substation
- Location
- Kings County, New York
- Technology
- Battery: 79.9 MW
- Total requested
- 79.9 MW
- Queue status
- Withdrawn
- Entered queue
- 20 April 2020
- Withdrawn
- December 2020
Location
Marker shows the centre of Kings County; the queue data does not give exact sites.
Other requests in Kings County
- Bluepoint Wind 1Offshore wind · 1,310 MW · in study
- Empire Wind 1Offshore wind · 816 MW · in study
- NYC Energy LLC - Phase 2Battery storage · 220 MW · in study
- Battery Park StorageBattery storage · 190 MW · in study
- Gowanus Energy StorageBattery storage · 150 MW · in study
- NYC EnergyBattery storage · 79.9 MW · in study
- Bayonne Energy Center IIIBattery storage · 49.8 MW · in study
- Pouch Energy Storage SystemBattery storage · 47.1 MW · in study
- Blue Sky Interconnect 2Offshore wind · 2,620 MW · withdrawn
- Atlantic Shores Offshore Wind Bight 4Offshore wind · 2,100 MW · withdrawn
- Atlantic Shores Offshore Wind Bight 1Offshore wind · 2,100 MW · withdrawn
- OW Ocean Winds East 7Offshore wind · 1,600 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem