ONSHORE WIND Β· SOUTHEASTOnshore wind project GI-51, Dekalb County
Onshore wind project GI-51, Dekalb County is a 200 MW onshore wind request withdrawn in the Southeast interconnection queue, in Dekalb County, Missouri, connecting to Associated Electric Cooperative, Incorporated.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2015 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GI-51
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Associated Electric Cooperative, Incorporated
- Connection point (POI)
- Osborn 161 kV bus
- Location
- Dekalb County, Missouri
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Service type
- Energy only (ERIS)
- Queue status
- Withdrawn
- Entered queue
- 20 March 2015
- Proposed online date
- November 2016
Location
Marker shows the centre of Dekalb County; the queue data does not give exact sites.
Other requests in Dekalb County
- Onshore wind project GEN-2015-005, Dekalb CountyOnshore wind Β· 200 MW Β· built
- Onshore wind project J168, Dekalb CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project GEN-2016-088, Dekalb CountyOnshore wind Β· 151 MW Β· withdrawn
- Onshore wind project GEN-2016-040, Dekalb CountyOnshore wind Β· 18.4 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem