United States βΊ Grid βΊ Interconnection queues βΊ West Virginia
SOLAR Β· PJMWeirton Solar 24 kV
Weirton Solar 24 kV is a 30.0 MW solar request withdrawn in the PJM interconnection queue, in Hancock County, West Virginia, connecting to APS.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2020 (completed)
- Withdrawn / abandonedSep 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AG1-029
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- APS
- Connection point (POI)
- Weirton Solar 24 kV
- Location
- Hancock County, West Virginia
- Technology
- Solar: 30.0 MW
- Total requested
- 30.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Wholesale Market P
- Queue status
- Withdrawn
- Entered queue
- 10 June 2020
- Proposed online date
- October 2024
- Withdrawn
- September 2023
Location
Marker shows the centre of Hancock County; the queue data does not give exact sites.
Power plants in West Virginia Β· Transmission lines in West Virginia
Other requests in Hancock County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem