🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Georgia

SOLAR + STORAGE · SOUTHEAST

Meriwether Panther Solar

Meriwether Panther Solar is a 125 MW solar + storage request in interconnection study in the Southeast interconnection queue, in Meriwether County, Georgia, connecting to Georgia Transmission.

Queue statusIn planning
  1. PlanningQueued Jan 2022 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2026 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
GI-161
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Georgia Transmission
Connection point (POI)
GTC 115 kV substation on Rocky Mount Rd
Location
Meriwether County, Georgia
Technology
Solar: 125 MW · Battery
Total requested
125 MW
Study phase
Facilities Study
Queue status
Active
Entered queue
28 January 2022
Proposed online date
December 2026

Location

Marker shows the centre of Meriwether County; the queue data does not give exact sites.

Power plants in Georgia · Transmission lines in Georgia

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem