United States β€Ί Grid β€Ί Interconnection queues β€Ί New Mexico

ONSHORE WIND Β· WEST

Onshore wind project Q03

Onshore wind project Q03 is a 700 MW onshore wind request withdrawn in the West interconnection queue, connecting to Salt River Project.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2008 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
Q03
Grid region
West (non-ISO utilities)
Utility / transmission owner
Salt River Project
Connection point (POI)
Coronado 500 kV
Location
New Mexico
Technology
Wind: 700 MW
Total requested
700 MW
Queue status
Withdrawn
Entered queue
14 July 2008
Proposed online date
June 2015

Location

No county location in the queue data.

Power plants in New Mexico Β· Transmission lines in New Mexico

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem