United States › Grid › Interconnection queues › New York

BATTERY STORAGE · NYISO

Brookhaven Rail Terminal

Brookhaven Rail Terminal is a 18.5 MW battery storage request withdrawn in the NYISO interconnection queue, in Suffolk County, New York, connecting to LIPA.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2017 (completed)
  2. Withdrawn / abandonedDec 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
650
Grid region
NYISO (New York)
Utility / transmission owner
LIPA
Developer
BRT Fuel Cell, LLC
Connection point (POI)
W. Yaphank - Yaphank 69kV
Location
Suffolk County, New York
Technology
Other Storage: 18.5 MW
Total requested
18.5 MW
Queue status
Withdrawn
Entered queue
3 August 2017
Withdrawn
December 2021

Location

Marker shows the centre of Suffolk County; the queue data does not give exact sites.

Power plants in New York · Transmission lines in New York

Other requests in Suffolk County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem