Solar project J1095, Desoto County

Solar project J1095, Desoto County is a 300 MW solar request withdrawn in the MISO interconnection queue, in Desoto County, Mississippi, connecting to ENTERGY MISSISSIPPI.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2018 (completed)
  2. Withdrawn / abandonedAug 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J1095
Grid region
MISO (Midcontinent)
Utility / transmission owner
ENTERGY MISSISSIPPI
Connection point (POI)
Twinkletown 230kV Substation
Location
Desoto County, Mississippi
Technology
Solar: 300 MW
Total requested
300 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: GIA; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
12 March 2018
Proposed online date
September 2021
Withdrawn
August 2019

Location

Marker shows the centre of Desoto County; the queue data does not give exact sites.

Power plants in Mississippi Β· Transmission lines in Mississippi

Other requests in Desoto County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem