United States βΊ Grid βΊ Interconnection queues βΊ Kansas
ONSHORE WIND Β· SPPOnshore wind project GEN-2016-158, Allen County
Onshore wind project GEN-2016-158, Allen County is a 252 MW onshore wind request withdrawn in the SPP interconnection queue, in Allen County, Kansas, connecting to KCPL.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2016 (completed)
- Withdrawn / abandonedSep 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- OperatingDec 2025 (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2016-158
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- KCPL
- Connection point (POI)
- West Gardner 345kV
- Location
- Allen County, Kansas
- Technology
- Wind: 252 MW
- Total requested
- 252 MW
- Service type
- Energy only (ERIS)
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 30 November 2016
- Proposed online date
- December 2025
- Came online
- December 2025
- Withdrawn
- September 2023
Location
Marker shows the centre of Allen County; the queue data does not give exact sites.
Other requests in Allen County
- Onshore wind project GEN-2024-258, Allen CountyOnshore wind Β· 300 MW Β· in study
- Onshore wind project GEN-2015-016, Allen CountyOnshore wind Β· 200 MW Β· built
- Onshore wind project GEN-2016-157, Allen CountyOnshore wind Β· 252 MW Β· withdrawn
- Solar project GEN-2020-089, Allen CountySolar Β· 104 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem