United States › Grid › Interconnection queues › New York

BATTERY STORAGE · NYISO

Wildwood Energy Storage

Wildwood Energy Storage is a 117 MW battery storage request withdrawn in the NYISO interconnection queue, in Suffolk County, New York, connecting to LIPA.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2019 (completed)
  2. Withdrawn / abandonedApr 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
823
Grid region
NYISO (New York)
Utility / transmission owner
LIPA
Developer
Wildwood Energy Storage, LLC
Connection point (POI)
Wildwood Substation 138kV
Location
Suffolk County, New York
Technology
Battery: 117 MW
Total requested
117 MW
Queue status
Withdrawn
Entered queue
15 April 2019
Withdrawn
April 2020

Location

Marker shows the centre of Suffolk County; the queue data does not give exact sites.

Power plants in New York · Transmission lines in New York

Other requests in Suffolk County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem