Solar + storage project 523, Lake County

Solar + storage project 523, Lake County is a 110 MW solar + storage request withdrawn in the Southeast interconnection queue, in Lake County, Alabama, connecting to Tennessee Valley Authority.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2022 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
523
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Tennessee Valley Authority
Location
Lake County, Alabama
Technology
Solar: 110 MW Β· Battery
Total requested
110 MW
Queue status
Withdrawn
Entered queue
25 October 2022
Proposed online date
March 2026

Location

Marker shows the centre of Lake County; the queue data does not give exact sites.

Power plants in Alabama Β· Transmission lines in Alabama

Other requests in Lake County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem