SOLAR Β· MISO

Solar project J709, Greene County

Solar project J709, Greene County is a 100 MW solar request withdrawn in the MISO interconnection queue, in Greene County, Mississippi, connecting to SOUTH MISSISSIPPI ELECTRIC POWER ASSOCIATION.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2016 (completed)
  2. Withdrawn / abandonedJan 2019 (project stopped here)
  3. ConsentedOct 2018 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J709
Grid region
MISO (Midcontinent)
Utility / transmission owner
SOUTH MISSISSIPPI ELECTRIC POWER ASSOCIATION
Connection point (POI)
Green Substation 230kV
Location
Greene County, Mississippi
Technology
Solar: 100 MW
Total requested
100 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: GIA; Post GIA Status: Withdrawn
Queue status
Withdrawn
Entered queue
9 September 2016
Agreement signed
17 October 2018
Proposed online date
April 2020
Withdrawn
January 2019

Location

Marker shows the centre of Greene County; the queue data does not give exact sites.