United States β€Ί Grid β€Ί Interconnection queues

OCTARY USA Β· INTERCONNECTION QUEUES

Battery storage interconnection queue in the USA (2014 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown5227 MW
Active in queue227 MW5 requests
Agreement signed227 MW5 requests
Withdrawn411,946 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

5 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Willow Springs Solar 3
Battery storage
50.0 MWAgreement signed Kern, CACAISO Apr 2014target 2026
North Johnson Energy Center
Battery storage
50.0 MWAgreement signed San Diego, CACAISO Apr 2014target 2026
Chula Vista Energy Center 2
Battery storage
50.0 MWAgreement signed San Diego, CACAISO Apr 2014target 2026
Ares Nevada
Battery storage
44.0 MWAgreement signed Nye, NVCAISO Apr 2014target 2027
Escondido Energy Center 2
Battery storage
33.0 MWAgreement signed San Diego, CACAISO Apr 2014target 2030

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)