Gas interconnection queue in the USA (2013 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown2733 MW
Active in queue733 MW2 requests
Agreement signed733 MW2 requests
Withdrawn7923.7 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

2 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project LGE-GIS-2013-001, Jefferson County
Gas
691 MWAgreement signed Jefferson, KYSoutheast Aug 2013target 2015
Gas project IA-PNM-2013-01, Valencia County
Gas
42.3 MWAgreement signed Valencia, NMWest May 2013target 2017

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)