United States β€Ί Grid β€Ί Interconnection queues

OCTARY USA Β· INTERCONNECTION QUEUES

Gas interconnection queue in the USA (2012 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown3480 MW
Active in queue480 MW3 requests
Agreement signed0.0 MW0 requests
Withdrawn8935.4 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

3 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project 12-051, Cowlitz County
Gas
375 MWPaused / redesign Cowlitz, WAWest Jul 2012target 2016
Gas project 12-049, Morrow County
Gas
75.0 MWPaused / redesign Morrow, ORWest Feb 2012target 2013
Gas project 12-048, Morrow County
Gas
30.0 MWPaused / redesign Morrow, ORWest Feb 2012target 2012

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)