πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues

OCTARY USA Β· INTERCONNECTION QUEUES

Queue requests in study in the USA (2014 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown83,104 MW
Active in queue7,680 MW38 requests
Agreement signed4,576 MW30 requests
Withdrawn66688.2 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

8 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project G0501, Klamath County
Gas
1,100 MWIn study Klamath, ORWest Oct 2014target 2018
FGE Texas 2 Gas
Gas Β· FGE Power
743 MWPaused / redesign Mitchell, TXERCOT Feb 2014target 2028
Halyard Wharton
Gas Β· Halyard Energy
484 MWPaused / redesign Wharton, TXERCOT Mar 2014target 2021
Onshore wind project GI-1404, Billings County
Onshore wind
383 MWIn study Billings, NDWest May 2014
Solar + storage project Q225, Maricopa County
Solar + storage
200 MWIn study Maricopa, AZWest Sep 2014target 2021
Hart Wind (Old POI)
Onshore wind
165 MWPaused / redesign Castro, TXERCOT Feb 2014
Geothermal project IA-PNM-2014-04, Dona Ana Cty County
Geothermal
29.0 MWIn study Dona Ana Cty, NMWest Mar 2014target 2018
Gas project 41, Lincoln County
Gas
0.3 MWIn study Lincoln, WAWest Apr 2014target 2014

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)