πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues

OCTARY USA Β· INTERCONNECTION QUEUES

Queue projects under construction in the USA (2021 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown101,474 MW
Active in queue227.7 GW896 requests
Agreement signed73.3 GW270 requests
Withdrawn2,149339.1 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

10 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Wind + storage project TCS-14, Garfield County
Wind + storage
375 MWUnder construction Garfield, WAWest Jan 2021target 2027
Solar project 171, Williamsburg County
Solar
249 MWUnder construction Williamsburg, SCSoutheast Oct 2021target 2028
Battery storage project 292, Pinellas County
Battery storage Β· Duke Energy Florida, LLC
225 MWUnder construction Pinellas, FLSoutheast Apr 2021target 2025
Solar project J1663, Ottawa County
Solar
200 MWUnder construction Ottawa, MIMISO Dec 2021target 2025
SR Rochelle Solar
Solar
120 MWUnder construction Wilcox, GASoutheast Dec 2021target 2026
Solar project J1514, Mississippi County
Solar
100 MWUnder construction Mississippi, ARMISO Dec 20212024
Solar project 925531, Williamsburg County
Solar
74.9 MWUnder construction Williamsburg, SCSoutheast Jun 2021target 2026
Solar project 165, Georgetown County
Solar
50.0 MWUnder construction Georgetown, SCSoutheast Oct 2021target 2024
Battery storage project 186466, Gaston County
Battery storage
50.0 MWUnder construction Gaston, NCSoutheast Jul 2021target 2025
Battery storage project 191894, Buncombe County
Battery storage Β· Duke Energy Progress, LLC
30.5 MWUnder construction Buncombe, NCSoutheast Aug 2021target 2026

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)