United States β€Ί Grid β€Ί Interconnection queues

OCTARY USA Β· INTERCONNECTION QUEUES

Other queue projects under construction in the USA

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown7101 MW
Active in queue74.4 GW328 requests
Agreement signed5,506 MW27 requests
Withdrawn1,273328.9 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

7 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Other project J868, Concordia Parish County
Other
37.2 MWUnder construction Concordia Parish, LAMISO Jun 2017target 1990
Other project 897247, Johnston County
Other
30.5 MWUnder construction Johnston, NCSoutheast Jun 2023target 2026
Other project J1247, St. Mary Parish County
Other
17.0 MWUnder construction St. Mary Parish, LAMISO Apr 20192023
Other project 897773, Johnston County
Other
10.0 MWUnder construction Johnston, NCSoutheast Jun 2023target 2026
Other project 894253, Cleveland County
Other
2.8 MWUnder construction Cleveland, NCSoutheast Jan 2000
Other project 897777, Wake County
Other
2.0 MWUnder construction Wake, NCSoutheast Jun 2023target 2025
Other project J646, Macomb County
Other
1.6 MWUnder construction Macomb, MIMISO Jun 2016target 2010

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)