United States β€Ί Grid β€Ί Interconnection queues

OCTARY USA Β· INTERCONNECTION QUEUES

Hydro queue projects under construction in the USA

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown314.6 MW
Active in queue2,273 MW47 requests
Agreement signed402 MW22 requests
Withdrawn22415.9 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

3 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Hydro project 570430, Montgomery County
Hydro Β· Duke Energy Progress, LLC
6.3 MWUnder construction Montgomery, NCSoutheast Jun 2022target 2025
Hydro project 899433, Montgomery County
Hydro Β· Duke Energy Progress, LLC
6.3 MWUnder construction Montgomery, NCSoutheast Jun 2023
Hydro project 897387, Macon County
Hydro
2.0 MWUnder construction Macon, NCSoutheast Jun 2023

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)