United States β€Ί Grid β€Ί Interconnection queues β€Ί Wyoming

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Wyoming (2016 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown9915 MW
Active in queue585 MW4 requests
Agreement signed585 MW4 requests
Withdrawn9915 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

9 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Onshore wind project GEN-2016-110, Platte County
Onshore wind
152 MWWithdrawn / abandoned Platte, WYSPP Nov 20162020
Onshore wind project GEN-2016-029, Platte County
Onshore wind
151 MWWithdrawn / abandoned Platte, WYSPP Mar 2016target 2017
Onshore wind project GEN-2016-023, Platte County
Onshore wind
151 MWWithdrawn / abandoned Platte, WYSPP Mar 2016target 2017
Onshore wind project 810, Uinta County
Onshore wind
101 MWWithdrawn / abandoned Uinta, WYWest Oct 2016target 2019
Solar + storage project 801, Natrona County
Solar + storage Β· Dinosolar, LLC
80.0 MWWithdrawn / abandoned Natrona, WYWest Sep 2016target 2019
Solar project CLPT G10, Laramie County
Solar
80.0 MWWithdrawn / abandoned Laramie, WYWest Dec 2016target 2019
Onshore wind project 807, Carbon County
Onshore wind Β· Elk Mountain Wind, LLC
75.9 MWWithdrawn / abandoned Carbon, WYWest Sep 2016target 2019
Onshore wind project CLPT G9, Laramie County
Onshore wind
75.0 MWWithdrawn / abandoned Laramie, WYWest Dec 2016target 2019
Solar + storage project 802, Natrona County
Solar + storage Β· Dinosolar, LLC
50.0 MWWithdrawn / abandoned Natrona, WYWest Sep 2016target 2019

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)