πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Wyoming

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Wyoming (2012 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown4396 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn4396 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project 425, Sublette County
Gas
156 MWWithdrawn / abandoned Sublette, WYWest Jun 2012target 2016
Onshore wind project 427, Sweetwater County
Onshore wind Β· OM Power 1, LLC
80.0 MWWithdrawn / abandoned Sweetwater, WYWest Jul 2012target 2015
Onshore wind project 440, Carbon County
Onshore wind
80.0 MWWithdrawn / abandoned Carbon, WYWest Oct 2012target 2016
Onshore wind project 407, Sweetwater County
Onshore wind
79.8 MWWithdrawn / abandoned Sweetwater, WYWest Jan 2012

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)