Completed queue projects in Wyoming (2010 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown340.2 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn1200 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

3 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Onshore wind project 335, Converse County
Onshore wind Β· Pioneer Wind Park I, LLC
40.0 MWOperating Converse, WYWest Jun 2010target 2016
Onshore wind project 363, Park County
Onshore wind Β· J Bar 9 Ranch, Inc.
0.1 MWOperating Park, WYWest Dec 2010target 2012
Onshore wind project 365, Carbon County
Onshore wind Β· Bureau of Land Management - Rawlins Office
0.1 MWOperating Carbon, WYWest Dec 2010target 2011

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)