United States β€Ί Grid β€Ί Interconnection queues β€Ί Wisconsin

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Wisconsin (2025 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown51,281 MW
Active in queue11.0 GW24 requests
Agreement signed0.0 MW0 requests
Withdrawn51,281 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

5 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project J4020, Kenosha County
Gas
481 MWWithdrawn / abandoned Kenosha, WIMISO May 2025target 2030
Battery storage project J4171, Racine County
Battery storage
300 MWWithdrawn / abandoned Racine, WIMISO Oct 2025target 2029
Battery storage project J4192, Racine County
Battery storage
200 MWWithdrawn / abandoned Racine, WIMISO Oct 2025target 2029
Solar project J3912, Chippewa County
Solar
150 MWWithdrawn / abandoned Chippewa, WIMISO Feb 2025target 2030
Solar project J3927, Sheboygan County
Solar
150 MWWithdrawn / abandoned Sheboygan, WIMISO Feb 2025target 2028

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)