United States β€Ί Grid β€Ί Interconnection queues β€Ί Wisconsin

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in Wisconsin (2011 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown4354 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn4354 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Onshore wind project J094, Manitowoc County
Onshore wind
200 MWWithdrawn / abandoned Manitowoc, WIMISO Nov 2011target 2010
Onshore wind project J109, Lafayette County
Onshore wind
99.0 MWWithdrawn / abandoned Lafayette, WIMISO Apr 2011target 2013
Onshore wind project J217, Columbia County
Onshore wind
50.0 MWWithdrawn / abandoned Columbia, WIMISO Jun 2011target 2014
Onshore wind project J221, St. Croix County
Onshore wind
5.0 MWWithdrawn / abandoned St. Croix, WIMISO Aug 2011target 2014

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)