πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Wisconsin

OCTARY USA Β· INTERCONNECTION QUEUES

Completed queue projects in Wisconsin (2014 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown3857 MW
Active in queue21.0 MW1 requests
Agreement signed21.0 MW1 requests
Withdrawn63,913 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

3 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project J390, Rock County
Gas
711 MWOperating Rock, WIMISO Sep 20142017
Onshore wind project J395, Lafayette County
Onshore wind
98.0 MWOperating Lafayette, WIMISO Sep 20142015
Gas project J382, Dane County
Gas
48.3 MWOperating Dane, WIMISO Jul 20142020

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)