United States β€Ί Grid β€Ί Interconnection queues β€Ί West Virginia

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in West Virginia (2018 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown5808 MW
Active in queue1,505 MW4 requests
Agreement signed45.0 MW1 requests
Withdrawn5808 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

5 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project AD2-182, Marshall County
Gas
482 MWWithdrawn / abandoned Marshall, WVPJM Mar 2018target 2022
Solar project AD2-157, Hampshire County
Solar
100 MWWithdrawn / abandoned Hampshire, WVPJM Mar 2018target 2021
Battery storage project AD2-126, Tucker County
Battery storage
90.0 MWWithdrawn / abandoned Tucker, WVPJM Mar 2018target 2020
Wild Hill Solar
Solar
77.5 MWWithdrawn / abandoned Jefferson, WVPJM Mar 2018target 2024
Battery storage project AE1-003, Grant County
Battery storage
59.0 MWWithdrawn / abandoned Grant, WVPJM Apr 2018target 2020

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)