United States β€Ί Grid β€Ί Interconnection queues β€Ί West Virginia

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in West Virginia (2016 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown6591 MW
Active in queue30.0 MW1 requests
Agreement signed30.0 MW1 requests
Withdrawn6591 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

6 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project AB2-141, Marshall County
Gas
394 MWWithdrawn / abandoned Marshall, WVPJM Apr 2016target 2019
ESC Brooke County Power I
Gas
80.0 MWWithdrawn / abandoned Brooke, WVPJM May 2016target 2021
ESC Brooke County Power I, LLC
Gas
65.0 MWWithdrawn / abandoned Brooke, WVPJM Apr 2016target 2021
Gas project AB2-101, Marshall County
Gas
31.0 MWWithdrawn / abandoned Marshall, WVPJM Apr 2016target 2019
Laurel Mountain Wind Farm & Energy Storage Facility
Wind + storage
16.3 MWWithdrawn / abandoned Barbour, WVPJM Sep 2016target 2019
Tri-State Solar
Solar
5.0 MWWithdrawn / abandoned Greenbrier, WVPJM Jun 2016target 2017

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)