United States β€Ί Grid β€Ί Interconnection queues β€Ί West Virginia

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in West Virginia (2011 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown4277 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn4277 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

4 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Onshore wind project X3-036, Grant County
Onshore wind
150 MWWithdrawn / abandoned Grant, WVPJM Aug 2011target 2012
Coal project X2-086, Grant County
Coal
77.0 MWWithdrawn / abandoned Grant, WVPJM Jul 2011target 2014
Hydro project X2-008, Taylor County
Hydro
30.0 MWWithdrawn / abandoned Taylor, WVPJM May 2011target 2013
Onshore wind project X1-014, Monroe County
Onshore wind
20.0 MWWithdrawn / abandoned Monroe, WVPJM Feb 2011target 2013

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)